Billy Earl Dade Middle School
Renovations

  • Construction Started

    1
  • Complete

    2
Current Status

Project Highlights


  • Accessibility – Americans with Disabilities Act (ADA)
    • Elevator refurbishments as assessed
  • School Modernization
    • Paint common interior areas (excluding classrooms) and paint exterior areas as applicable
  • Building Envelope
    • Exit doors replacement as assessed including frame and associated hardware
    • Windows removal and replacement as assessed
    • Roof replacement as assessed
  • Mechanical, Electrical, Plumbing
    • Variable Air Volume (VAV) / Single zone air handling units replacement as assessed
    • Direct Digital Controls (DDC) upgrades as required
    • Lights replacement in areas prioritized by the assessment teams
    • Power distribution panel replacements as assessed
    • PA System replacement
    • Stage lights replacement as assessed
    • Stage sound system replacement / addition
    • Grease trap upgrades
  • Restroom Refurbishments
    • Scope as identified by the assessment teams
  • Sitework / Grounds
    • Bus drop-off lane
    • Parking lot striping as required per the assessment
    • Dumpster pad and fencing around dumpsters as required for code compliance
  • Fire Alarm/ Security Systems
    • Security system replacement / addition
  • Campus Athletics Refurbishments
    • Locker room air conditioning

 

Project Information

Location:

2801 Park Row Ave.
Dallas, TX 75215
View Map

Trustee:

Bernadette Nutall, District 9

Project Status:

Complete

Project Manager:

Parsons

Architect:

KAI Texas Architects

Contractor: