Bond at Work

John B. Hood Middle School
Renovations

  • Construction Started

    1
  • Complete

    2
Current Status

Project Highlights


  • Accessibility – Americans with Disabilities Act (ADA)
    • Elevator refurbishments as assessed
  • School Modernization
    • Paint common interior areas (excluding classrooms) and paint exterior areas as applicable
  • Building Envelope
    • Exit doors replacement as assessed including frame and associated hardware
  • Mechanical, Electrical and Plumbing
    • Boiler replacement as assessed
    • Chiller and cooling tower replacement as assessed
    • Fiberglass piping replacement as assessed
    • Variable Air Volume (VAV) / Single zone air handling units replacement as assessed
    • Switchgear as assessed
    • Lights replacement in areas prioritized by the assessment teams
    • Hand dryers as required per the assessment
    • Stage lights replacement as assessed
    • Grease trap upgrades
  • Restroom Refurbishments
    • Scope as identified by the assessment teams
  • Sitework / Grounds
    • Bus drop-off lane and striping as assessed
    • Dumpster pad and fencing around dumpsters as required for code compliance
  • Campus Athletics Refurbishments
    • Locker room air conditioning
  • Kitchen and Dining Refurbishments
    • Dining room expansions (4,800 sq. ft.)
    • Dining / Kitchen infrastructure upgrades

 

Project Information

Location:

7625 Hume Drive
Dallas, TX 75227
View Map

Trustee:

Bernadette Nutall, District 9

Project Status:

Complete

Project Manager:

Jacobs Engineering Inc.

Architect:

Boynton Williams & Assoc.

Contractor: