Bond at Work

Martha Turner Reilly Elementary School
Renovations

  • Construction Started

    1
  • Complete

    2
Current Status

Project Highlights


  • School Modernization
    • Paint common interior areas (excluding classrooms) and paint exterior areas as applicable
  • Building Envelope
    • Exit doors replacement as assessed including frame and associated hardware
  • Mechanical, Electrical and Plumbing
    • Boiler replacement as assessed
    • Chiller replacement as assessed
    • Cooling tower replacement
    • Fiberglass piping replacement as assessed
    • Variable Air Volume (VAV) / Single zone air handling unit replacement as assessed
    • Electrical switchgear upgrades as required
    • Lights replacement in areas prioritized by the assessment teams
    • Electrical power distribution panel upgrades
    • PA System replacement
    • Stage lights replacement as assessed
    • Stage sound system replacement / addition
    • Grease trap upgrades
  • Restroom Refurbishments
    • Scope as identified by the assessment teams
  • Sitework / Grounds
    • Bus drop-off lane
    • Parking lot paving and striping as required per the assessment
    • Playground equipment and fall zone
    • Dumpster pad and fencing around dumpsters as required for code compliance

 

Project Information

Location:

11230 Lippitt Ave.
Dallas, TX 75218
View Map

Trustee:

Dan Micciche, District 3

Project Status:

Complete

Project Manager:

AECOM

Architect:

Hahnfeld Hoffer Stanford

Contractor:

  • Construction Underway