Skyline High School and Career Development Center
Renovations/Additions

  • Construction Started

    1
  • Complete

    2
Current Status

Project Highlights


  • Gymnasium Addition
    • Addition of one main gymnasium
    • 31,000 sq. ft.
    • Seating capacity: 2,000
  • Accessibility – Americans with Disabilities Act (ADA)
    • Elevator refurbishments as assessed
  • School Modernization
    • Paint common interior areas (excluding classrooms) and paint exterior areas as applicable
  • Building Envelope
    • Exit doors replacement as assessed including frame and associated hardware
  • Mechanical, Electrical and Plumbing
    • Boiler replacements as assessed
    • Chiller replacements as assessed
    • Cooling tower replacement as assessed
    • Grease trap upgrades
  • Restroom Refurbishments
    • Scope as identified by the assessment teams
  • Sitework / Grounds
    • Parking lot paving and striping as required per the assessment
    • Playground equipment replacement, including border and fall zone
    • Dumpster pad and fencing around dumpsters as required for code compliance
  • Fire Alarm/ Security Systems
    • Security system replacement / addition
  • Kitchen and Dining Refurbishments
    • Dining room expansions (11,000 sq. ft.)
    • Seating capacity: 1,079 (908 interior seats and 171 seats in an exterior courtyard)
    • Dining / Kitchen infrastructure upgrades

 

Project Information

Location:

7777 Forney Road
Dallas, TX 75227
View Map

Trustee:

Bernadette Nutall, District 9

Project Status:

Complete

Project Manager:

AECOM

Architect:

Jacobs & Associates

Contractor:

  • Construction Underway
  • Skyline Groundbreaking Set Up
  • Skyline Choir and JROTC
  • Skyline JROTC
  • Skyline Choir
  • Principal Wright and Senior Stephanie Rodriguez
  • Alumni President Sandy Wilson with  former Coach J.D. Mayo
  • Skyline Groundbreaking Ceremony