Bond at Work

Thomas Jefferson High School
Renovations

  • Construction Started

    1
  • Complete

    2
Current Status

Project Highlights


  • Accessibility – Americans with Disabilities Act (ADA)
    • Elevator refurbishments as assessed
  • School Modernization
    • Paint common interior areas (excluding classrooms) and paint exterior areas as applicable
  • Building Envelope
    • Exit doors replacement as assessed including frame and associated hardware
    • Roof replacement as assessed
  • Mechanical, Electrical, Plumbing
    • Boiler replacement as assessed
    • Cooling tower replacement as assessed
    • Pump replacements as assessed
    • Variable Air Volume (VAV)/ Single zone air handling units replacement as assessed
    • Direct Digital Controls (DDC) replacement / addition as assessed
    • Lights replacement in areas prioritized by the assessment teams
    • Grease trap upgrades
  • Restroom Refurbishments
    • Scope as identified by the assessment teams
  • Sitework / Grounds
    • Parking lot paving and striping as required per the assessment
    • Dumpster pad and fencing around dumpsters as required for code compliance.
  • Campus Athletics Refurbishments
    • Locker room air conditioning
  • Science Lab Additions
    • 2 science lab additions
  • Kitchen and Dining Refurbishments
    • Dining room expansions (2,800 sq. ft.)
    • Dining / Kitchen infrastructure upgrades

 

Project Information

Location:

4001 Walnut Hill Lane
Dallas, TX 75229
View Map

Trustee:

Edwin Flores, District 1

Project Status:

Complete

Project Manager:

Jacobs Engineering Inc.

Architect:

URS Corporation

Contractor: