  • Construction Started

    1
  • Complete

    2
Current Status

Project Highlights


  • Accessibility – Americans with Disabilities Act (ADA)
    • Elevator refurbishments as assessed
  • School Modernization
    • Paint common interior areas (excluding classrooms) and paint exterior areas as applicable
  • Building Envelope
    • Exit doors replacement as assessed including frame and associated hardware
  • Mechanical, Electrical and Plumbing
    • Chiller replacement as assessed
    • Cooling tower replacement
    • Pump replacements as assessed
    • Fiberglass piping replacement as assessed
    • Variable Air Volume (VAV) / Single zone air handling units replacement as assessed
    • Grease trap upgrades
  • Restroom Refurbishments
    • Scope as identified by the assessment teams
  • Sitework / Grounds
    • Bus drop-off lane striping as assessed
    • Parking lot paving and striping as required per the assessment
    • Dumpster pad and fencing around dumpsters as required for code compliance
  • Campus Athletics Refurbishments
    • Locker room air conditioning
  • Kitchen and Dining Refurbishments
    • Dining room expansions (875 sq. ft.)
    • Dining / Kitchen infrastructure upgrades

 

Project Information

Location:

4505 Ridgeside Drive
Dallas, TX 75244
View Map

Trustee:

Edwin Flores, District 1

Project Status:

Complete

Project Manager:

AECOM

Architect:

WRA Architects

Contractor: