Bond at Work

Wilmer-Hutchins High School
Repurposed

  • Planning Stages

    1
  • Construction Started

    2
  • Complete

    3
Current Status

Project Highlights


  • School Modernization
    • Paint common interior areas (excluding classrooms) and paint exterior areas as applicable
    • Ceiling replacement as assessed
    • Flooring replacement as assessed
    • Marker board and tack board replacement as assessed
    • Millwork as assessed
    • Window replacement as assessed
    • Science lab refurbishment as assessed
    • Interior door replacements as assessed
  • Building Envelope
    • Exit doors replacement as assessed including frame and associated hardware
    • Roof replacement
  • Mechanical, Electrical and Plumbing
    • Replace Heating, Ventilating and Air Conditioning (HVAC) system with new per Engineer’s recommendations
    • Drinking fountains replacements
    • Lights replacement as assessed
    • New stage flooring, sound system, lights and curtains
    • New P.A. system
  • Restroom Refurbishments
    • Scope as identified by assessment teams
  • Sitework / Grounds
    • Parking lot resurfacing as assessed
    • Fields refurbishment, including fence replacement as assessed
    • Dumpster pad and fencing around dumpsters as required for code compliance.
  • Athletic Renovations
    • Locker room renovations and air conditioning

 

Project Information

Location:

5520 Langdon Road
Dallas, TX 75241
View Map

Trustee:

Lew Blackburn, Ph.D., District 5

Project Status:

Complete

Project Manager:

Jacobs Engineering Inc.

Architect:

Johnson/McKibben

Contractor:

McCarthy/Warrior JV

  • Sen. Royce West Congratulates Principal Brooks at W-H HS Dedication
  • Trustees Blackburn and Ranger with Principal Brooks
  • Principal Brooks and Guests at W-H High School Dedication
  • Principal and Devin with Student Speakers at W-H HS Dedication
  • School mural
  • Trustee Carla Ranger visiting a classroom
  • Students in the classroom on the first day of school
  • Students registering in the school gymnasium
  • Students registering for classes on the first day of school